When a drop of rain leaves a scrap yard in Oregon,
it doesn't leave one jurisdiction.
It leaves six.
Three regulatory resets simultaneously.
Most facilities aren’t ready. You can be.
Less than a thimble in an Olympic pool.
That is the concentration of 6PPD-quinone at which coho salmon begin dying within hours. The compound is a reaction product of a tire-preservative chemical with ambient ozone. Every storm drain at every logistics yard carries it into salmon-bearing water.
A treaty signed in 1855 is, still, the most expensive line in this story.
A three-ring binder. A spreadsheet. One person’s memory. A consultant who answers when it suits them. If that sounds familiar — you’re in the majority.
The record is public.
Enforcement cadence — 24 months
Cadence
Monthly batch enforcement waves. Every 4–6 weeks a new set of public penalties lands.
Escalation
Two headline actions in twelve months — ~$350K and $357,461. Both public record.
Horizon
EPA MSGP expired Feb 28, 2026. Oregon 1200-Z expires June 30. PFAS enforcement waves ahead.
the TurboTax of industrial stormwater.
Keep the generated SWPCP even if you walk away — standalone value ≈ $1,500–$5,000